test2

How It Works

How It
Works

Step 01
Design
  • Precast structures with Shear wall construction, Column wall, beams & Hollow core slab is designed by our team.
Step 02
Production
  • Specialist workshops for mould fabrication and jig-built cages.
  • Carefully specified concrete poured & vibrated to international standards.
Step 03
Transportation
  • Components stacked on clean battens or plastic pads.
  • Delivered to site via A-frame or Flat bed trailers for instant erection.
Step 04
Erection
  • Components erected straight from the trailer most times.
  • Leads to faster erection times with reduced on-site activity.
01
02
03
04
Scroll to Top