How It Works
How It
Works
Step 01
Design
- Precast structures with Shear wall construction, Column wall, beams & Hollow core slab is designed by our team.
Step 02
Production
- Specialist workshops for mould fabrication and jig-built cages.
- Carefully specified concrete poured & vibrated to international standards.
Step 03
Transportation
- Components stacked on clean battens or plastic pads.
- Delivered to site via A-frame or Flat bed trailers for instant erection.
Step 04
Erection
- Components erected straight from the trailer most times.
- Leads to faster erection times with reduced on-site activity.
01
02
03
04
